Our projects

01.08.2023.
WEST Gate (HR)
Dalmatia Tower - The highest building in Croatia
more

01.05.2023.
FACC (HR)
FACC - New production fascility in Croatia
more

20.09.2022.
Ansons Prag (CZ)
Ansons Prag
more

20.07.2022.
Peek & Cloppenburg Prag (CZ)
Peek & Cloppenburg Prag
more

20.03.2022.
CPXX Lubljana (SLO)
CPXX Lubljana
more

01.02.2022.
AL Reem Hospital (UAE)
AL Reem Hospital
more

01.11.2021.
CPXX Weiz (AT)
CPXX Weiz
more

01.11.2021.
Peek & Cloppenburg Waterfront (RS)
Peek & Cloppenburg Waterfront
more

01.09.2021.
CPXX Waterfront (RS)
CPXX Waterfront - IMAX on a new level....
more

01.03.2021.
CPXX Algund (IT)
CPXX Algund
more

17.04.2020.
CPXX BEO (RS)
CPXX BEO
more

19.12.2019.
Cineplexx Tirana 2 (AL)
Multiplex Cinema Tirana
more

19.11.2019.
Cineplexx Prizren (Kososvo)
Multiplex Cinema
more

18.11.2019.
Cineplexx Novi Sad (RS)
Multiplex Cinema Novi Sad
more

12.09.2019.
Cineplexx Satu Mare (RO)
Multiplex Cinema
more

01.06.2019.
Camp Borik (HR)
Luxury Campng facility
more

16.05.2019.
Lesnina Novi Sad (RS)
Furniture store stand alone
more

15.04.2019.
Starbucks Belgrade (RS)
1st Starbucks in Serbia
more

01.02.2019.
Bezanija - Beograd (RS)
Flats and Offices
more

31.12.2018.
Yamamay
In 2018 we realised 8 stores in HR and CG
more

18.12.2018.
Cineplexx Thessaloniki (GR)
IMAX Cinema
more

01.12.2018.
KFC Zadar (HR)
KFC first Drive-In in Croatia!
more

07.06.2018.
Lesnina Sesvete, Zagreb (HR)
XXXLesnina reconstructs their first centre in Zagreb
more

01.05.2018.
Hotel Borik, Zadar (HR)
Reconstruction of the legendary Hotel Borik in Zadar
more

01.04.2018.
XXXLesnina Pula (HR)
XXXLesnina finally enters Pula
more

15.03.2018.
Cineplexx Parndorf (AT)
Multiplex Cinema Parndorf
more

20.12.2017.
Anton Paar (BiH)
A modern and future-oriented production facility.....
more

01.12.2015.
Hotel Resort Punta Skala, Zadar (HR)
Technical Due Diligence
more

01.11.2015.
Food Court - City Center One (HR)
A food court which sets new benchmarks…
more

01.06.2015.
PV Plants (HR)
PV systems for 7 locations in Croatia
more

15.05.2015.
Hotel Liburna, Korčula (HR)
Complete reconstruction in 4 months. It is really possible!
more

10.04.2015.
Mömax - Lubljana (SLO)
XXXLutz with Mömax at new location in Lubljana!
more

30.03.2015.
Yamamay - new locations (HR)
New locations in Croatia, a long lasting cooperation!
more

10.12.2014.
Hotel Radisson, Belgrade (RS)
The absolute Top-Hotel in Belgrade!
more

11.11.2014.
Lesnina Zadar (HR)
XXXLutz enters with Lesnina Zadar!
more

01.08.2014.
Ministry of Finance, Skopje (MK)
One of the most modern buildings in the Balkans!
more

12.02.2014.
Cineplexx
Our services on 11 different locations in 5 countries.
more

07.01.2014.
Shop fit out (HR)
We are proud on our success in fit out works for retail shops.
more

11.12.2013.
PV-PLant Barban (HR)
Our services for one of the biggest PV-Plants in Croatia.
more

17.04.2013.
Colosseum - Shopping Mall (HR)
Shopping in Slavonski Brod, Colosseum brings new demensions!
more

01.06.2012.
Peek & Cloppenburg (HR)
Many years of cooperation with P&C in fit out.
more

10.03.2012.
HIPERMARKET, Interspar (HR)
Aside shopping centres also hypermarkets belongs to our strenghts.
more

01.03.2012.
City Center One, Zagreb-East (HR)
Again a huge shopping mall in Zagreb.
more

01.11.2010.
City Center One, Split (HR)
The largest shopping mall in Dalmacija.
more

05.02.2010.
VAMA Varaždin (HR)
Shoping mall in downtown of Varaždin.
more

15.04.2009.
SAVA Tower (HR)
A modern business center in Zagreb.
more

03.09.2008.
HBC Riga (LAT)
A commercial centre with very high demands.
more

04.04.2008.
City Center One, Zagreb-West (HR)
Extension of existing shopping mall City Center One West.
more

01.01.2008.
Hotel Miramare (HR)
The hotel coming from K&K time becomes completely renovated.
more
VAMA Varaždin (HR)
Design
The existing shopping center "VAMA" will be completely renovated and extended. Through the distinguished location and the subterranean access to the future basement garage, this center will be one of the top addresses in the city. In order to offer pleasant and unconcerned shopping experience exclusive equipment and newest building technologies are predicted.
The investor, who trusted on our team already in the past, puts highest quality control requirements to the planning and the following execution works. To achieve a as short as possible closing period of the center, which is presently still in operation, needs optimal and coordinated planning processes. This is guaranteed by close cooperation of the project team and nothing more restricts an on-time finishing.
Project Centrum delivered as general designer the permit design for M&E services, architecture, statics, physics, safety, fire protection and lifts.
he following systems were under our competency:
- Heating and cooling
- Ventilation
- Water and sewage system
- Hydrant network
- Sprinkler
- lectrical installation
- Emergency power supply
- Fire detection system
- Telephone system und IT-cabling
- Public addressing system
- Arhitecture
- Statics
Key figures
- Surface area: 28.000 m2
- Electrical connection: 2 MW
- Ventilation capacity: 250.000 m3/h
- Cooling capacity: 2 MW