Our projects
01.08.2023.
WEST Gate (HR)
Dalmatia Tower - The highest building in Croatia
more
01.05.2023.
FACC (HR)
FACC - New production fascility in Croatia
more
20.09.2022.
Ansons Prag (CZ)
Ansons Prag
more
20.07.2022.
Peek & Cloppenburg Prag (CZ)
Peek & Cloppenburg Prag
more
20.03.2022.
CPXX Lubljana (SLO)
CPXX Lubljana
more
01.02.2022.
AL Reem Hospital (UAE)
AL Reem Hospital
more
01.11.2021.
CPXX Weiz (AT)
CPXX Weiz
more
01.11.2021.
Peek & Cloppenburg Waterfront (RS)
Peek & Cloppenburg Waterfront
more
01.09.2021.
CPXX Waterfront (RS)
CPXX Waterfront - IMAX on a new level....
more
01.03.2021.
CPXX Algund (IT)
CPXX Algund
more
17.04.2020.
CPXX BEO (RS)
CPXX BEO
more
19.12.2019.
Cineplexx Tirana 2 (AL)
Multiplex Cinema Tirana
more
19.11.2019.
Cineplexx Prizren (Kososvo)
Multiplex Cinema
more
18.11.2019.
Cineplexx Novi Sad (RS)
Multiplex Cinema Novi Sad
more
12.09.2019.
Cineplexx Satu Mare (RO)
Multiplex Cinema
more
01.06.2019.
Camp Borik (HR)
Luxury Campng facility
more
16.05.2019.
Lesnina Novi Sad (RS)
Furniture store stand alone
more
15.04.2019.
Starbucks Belgrade (RS)
1st Starbucks in Serbia
more
01.02.2019.
Bezanija - Beograd (RS)
Flats and Offices
more
31.12.2018.
Yamamay
In 2018 we realised 8 stores in HR and CG
more
18.12.2018.
Cineplexx Thessaloniki (GR)
IMAX Cinema
more
01.12.2018.
KFC Zadar (HR)
KFC first Drive-In in Croatia!
more
07.06.2018.
Lesnina Sesvete, Zagreb (HR)
XXXLesnina reconstructs their first centre in Zagreb
more
01.05.2018.
Hotel Borik, Zadar (HR)
Reconstruction of the legendary Hotel Borik in Zadar
more
01.04.2018.
XXXLesnina Pula (HR)
XXXLesnina finally enters Pula
more
15.03.2018.
Cineplexx Parndorf (AT)
Multiplex Cinema Parndorf
more
20.12.2017.
Anton Paar (BiH)
A modern and future-oriented production facility.....
more
01.12.2015.
Hotel Resort Punta Skala, Zadar (HR)
Technical Due Diligence
more
01.11.2015.
Food Court - City Center One (HR)
A food court which sets new benchmarks…
more
01.06.2015.
PV Plants (HR)
PV systems for 7 locations in Croatia
more
15.05.2015.
Hotel Liburna, Korčula (HR)
Complete reconstruction in 4 months. It is really possible!
more
10.04.2015.
Mömax - Lubljana (SLO)
XXXLutz with Mömax at new location in Lubljana!
more
30.03.2015.
Yamamay - new locations (HR)
New locations in Croatia, a long lasting cooperation!
more
10.12.2014.
Hotel Radisson, Belgrade (RS)
The absolute Top-Hotel in Belgrade!
more
11.11.2014.
Lesnina Zadar (HR)
XXXLutz enters with Lesnina Zadar!
more
01.08.2014.
Ministry of Finance, Skopje (MK)
One of the most modern buildings in the Balkans!
more
12.02.2014.
Cineplexx
Our services on 11 different locations in 5 countries.
more
07.01.2014.
Shop fit out (HR)
We are proud on our success in fit out works for retail shops.
more
11.12.2013.
PV-PLant Barban (HR)
Our services for one of the biggest PV-Plants in Croatia.
more
17.04.2013.
Colosseum - Shopping Mall (HR)
Shopping in Slavonski Brod, Colosseum brings new demensions!
more
01.06.2012.
Peek & Cloppenburg (HR)
Many years of cooperation with P&C in fit out.
more
10.03.2012.
HIPERMARKET, Interspar (HR)
Aside shopping centres also hypermarkets belongs to our strenghts.
more
01.03.2012.
City Center One, Zagreb-East (HR)
Again a huge shopping mall in Zagreb.
more
01.11.2010.
City Center One, Split (HR)
The largest shopping mall in Dalmacija.
more
05.02.2010.
VAMA Varaždin (HR)
Shoping mall in downtown of Varaždin.
more
15.04.2009.
SAVA Tower (HR)
A modern business center in Zagreb.
more
03.09.2008.
HBC Riga (LAT)
A commercial centre with very high demands.
more
04.04.2008.
City Center One, Zagreb-West (HR)
Extension of existing shopping mall City Center One West.
more
01.01.2008.
Hotel Miramare (HR)
The hotel coming from K&K time becomes completely renovated.
more
City Center One, Split (HR)
Design and Project Management
The Kaufmann Group expanded to Dalmatia and erected a 180.000 m2 large shopping centre in Split. Already in the design phase great attention was paied on latest technologies and energy efficiency.
Projekt Centrum drafted the main design for M&E services which was based on the concepts of the office Greif and Hross&Partner. To ensure economical operating of the centre, various concepts to optimise energy consumption have been developed specially in the area of technology for air-conditioning.
Close cooperation with contractors, detailed time schedules and continual coordination of all associates ensured on time completion of construction.
Projekt Centrum was responsible for design and project management of M&E services and therefore played the key role in the project.
The following systems were under our competency:
- Heating and cooling
- Ventilation
- Water and sewage system
- Hydrant network
- Sprinkler
- lectrical installation
- Emergency power supply
- Fire detection system
- Telephone system und IT-cabling
- Public addressing system
Key figures
- Surface area: 180.000 m2
- Cables laid: 850 km
- Fire detectors: 2.600 pcs.
- Sprinklers: 14.000 pcs.
- Electrical connection: 10 MW
- Ventilation capacity: 1.000.000 m3/h
- Cooling capacity: 7 MW